logo
ProjectClosed

PETROLEUM REHAB

Sector: Water Supply and Storage • Location: Zambia

Source: World Bank Group

The objectives of the Petroleum Sector Rehabilitation Project are: (a) policy development throug encouraging establishment of satisfactory regulatory framework, compet imports of petroleum and eventual deregulation of market; (b) rehabili Tazama pipeline as a least cost and reliable means of supplying petrol Zambia and strengthen Tazama's institutional set up; (c) improve infrastructure facilities

Status
Closed
Sector
Water Supply and Storage, Rail, Automotive, Oil and Gas, Telecommunications, Government
Location
Zambia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about PETROLEUM REHAB

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “PETROLEUM REHAB” is an infrastructure initiative in the Water Supply and Storage sector, located in Zambia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objectives of the Petroleum Sector Rehabilitation Project are: (a) policy development throug encouraging establishment of satisfactory regulatory framework, compet imports of petroleum and eventual deregulation of market; (b) rehabili Tazama pipeline as a least cost and reliable means of supplying petrol Zambia and strengthen Tazama's institutional set up; (c) improve infrastructure facilities to reduce the delivered cost of petroleum; a provide a basis for the private sector companies to facilitate exports neighboring landlocked countries, using surplus pipeline capacity, to export earnings. The project consists of rehabilitation of Tazama pip corrosion protection, overhauling of 14 pumps and their drives, replac 9 generators in the pump stations, improving telecommunication system, to existing storage tanks and construction of a new tank in Ndola, pur vehicles, spare parts and project equipment; expansion of Ndola rail l facilities with simultaneous loading of 12 wagons, replacement of load pumps and product measuring instruments; and capacity strengthening in and the Ministry of Energy and Water Development.

Original sector

FY17 - Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

Zambia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Rail, Automotive, Oil and Gas, Telecommunications, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project