PETROLEUM REHAB
Sector: Water Supply and Storage • Location: Zambia
Source: World Bank Group
The objectives of the Petroleum Sector Rehabilitation Project are: (a) policy development throug encouraging establishment of satisfactory regulatory framework, compet imports of petroleum and eventual deregulation of market; (b) rehabili Tazama pipeline as a least cost and reliable means of supplying petrol Zambia and strengthen Tazama's institutional set up; (c) improve infrastructure facilities
- Status
- Closed
- Sector
- Water Supply and Storage, Rail, Automotive, Oil and Gas, Telecommunications, Government
- Location
- Zambia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about PETROLEUM REHAB
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Petroleum Sector Rehabilitation Project are: (a) policy development throug encouraging establishment of satisfactory regulatory framework, compet imports of petroleum and eventual deregulation of market; (b) rehabili Tazama pipeline as a least cost and reliable means of supplying petrol Zambia and strengthen Tazama's institutional set up; (c) improve infrastructure facilities to reduce the delivered cost of petroleum; a provide a basis for the private sector companies to facilitate exports neighboring landlocked countries, using surplus pipeline capacity, to export earnings. The project consists of rehabilitation of Tazama pip corrosion protection, overhauling of 14 pumps and their drives, replac 9 generators in the pump stations, improving telecommunication system, to existing storage tanks and construction of a new tank in Ndola, pur vehicles, spare parts and project equipment; expansion of Ndola rail l facilities with simultaneous loading of 12 wagons, replacement of load pumps and product measuring instruments; and capacity strengthening in and the Ministry of Energy and Water Development. |
Original sector | FY17 - Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Zambia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Rail, Automotive, Oil and Gas, Telecommunications, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Zambia
- Open for FDI through a majority stake/Development of a new project/Production, transmission and distribution of electricity/DEVELOPMENT OF CHIPOTA FALLS 200 KW MINI-HYDRO PROJECT
- Development of the 118.4MW Hydro Electricity Plant and Associated Transmission Facilities in Zambia
- Fish Cage Farming Project on Lake Chinweshiba
- Shangombo Sugar Project
- Kashitu farm estate
- Agriflora Limited
- Kapamba Mini Hydro Power Project
- Ngonye Falls Hydroelectric Project
