Petrom Brazi CCGT project
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
The project includes design, manufacturing, construction and operation of the Combined Cycle Gas Turbine (CCGT) Power Plant in the vicinity of Ploiesti, Romania. The plant will comprise two gas and one steam turbine of total capacity of 860 MWe. The project comprises also 3 km electrical overhead line and 30 km gas pipeline.
- Status
- Under Construction
- Sector
- Wind, Power Generation (CCGT), Manufacturing (Industrial), Government
- Location
- Romania
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about Petrom Brazi CCGT project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | <p>The project includes design, manufacturing, construction and operation of the Combined Cycle Gas Turbine (CCGT) Power Plant in the vicinity of Ploiesti, Romania. The plant will comprise two gas and one steam turbine of total capacity of 860 MWe. The project comprises also 3 km electrical overhead line and 30 km gas pipeline.</p> |
Original sector | Energy |
Location
Country | Romania |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Manufacturing (Industrial), Government |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
