Petrotec’s New Electrical Facility
The owner, status and timeline of this project. A free account opens every field.
Source: Gulf Times
Al Mahhar Holding has inaugurated a new electrical facility under its subsidiary, Petroleum Technology Company (Petrotec), at Al Wakra Logistics Park-B. This facility aims to bolster the local manufacturing sector and meet the increasing demand from the oil and gas and infrastructure sectors for high-quality, reliable products.
- Status
- Closed
- Sector
- Oil and Gas, Manufacturing (Industrial), Warehouse
- Location
- Al Wakra, Qatar
- Updated
- 22 Jul 2026
- Source
- Gulf Times
ConstructChat
Ask ConstructChat about Petrotec’s New Electrical Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Al Mahhar Holding has inaugurated a new electrical facility under its subsidiary, Petroleum Technology Company (Petrotec), at Al Wakra Logistics Park-B. This facility aims to bolster the local manufacturing sector and meet the increasing demand from the oil and gas and infrastructure sectors for high-quality, reliable products. |
Original sector | Manufacturing |
Location
Country | Qatar |
City | Al Wakra |
Source
Source | Gulf Times |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Manufacturing (Industrial), Warehouse |
Article published date | 2025-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
