logo

PFAS Treatment at Sandy Hollow Road Well No.1 & 2 Facility

Sector: Water Supply and Storage • Location: Port Washington, New York, United States of America

Source: Dodge

Project
Gc Bidding

This project consists of three separate contracts for compliance with Wicks Law and generally consists of the construction of a new granular activated carbon facility including a building enclosure and new piping, valves, chemical treatment, and all appurtenances and accessories as shown on the Drawings and specified herein. The work also includes all associated connections to the existing wells,

Status
Prospective
Sector
Water Supply and Storage, Government, Power Generation (CCGT), Road, Chemical (Industrial), Commercial, Seaport, Manufacturing (Industrial)
Location
Port Washington, New York, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about PFAS Treatment at Sandy Hollow Road Well No.1 & 2 Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PFAS Treatment at Sandy Hollow Road Well No.1 & 2 Facility” is an infrastructure initiative in the Water Supply and Storage sector, located in Port Washington, New York, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

gc bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of three separate contracts for compliance with Wicks Law and generally consists of the construction of a new granular activated carbon facility including a building enclosure and new piping, valves, chemical treatment, and all appurtenances and accessories as shown on the Drawings and specified herein. The work also includes all associated connections to the existing wells, power, controls, SCADA, all wiring and devices, miscellaneous building improvements at existing f...

Procurement method

Budget

Location

Country

United States of America (USA)

State

New York

City

Port Washington

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Power Generation (CCGT), Road, Chemical (Industrial), Commercial, Seaport, Manufacturing (Industrial)

Article published date

2025-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project