Phagwara – Rupnagar section of NH 344A
Sector: Commercial • Location: India
Source: World Bank Group
The project entails a four-laning of an 81 km stretch of Phagwara - Rupnagar which passes through Banga town and the proposed Nawashahir bypass, and concludes at Rupnagar.
The sponsor, GR Infraprojects Limited, is a sole owner of the contract and will develop the project via its project company - GR Phagwara Expressway Pvt Ltd. The concession was awarded to GR Infraprojects as a result of a bid
- Status
- Prospective
- Sector
- Commercial, Road, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Phagwara – Rupnagar section of NH 344A
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails a four-laning of an 81 km stretch of Phagwara - Rupnagar which passes through Banga town and the proposed Nawashahir bypass, and concludes at Rupnagar. The sponsor, GR Infraprojects Limited, is a sole owner of the contract and will develop the project via its project company - GR Phagwara Expressway Pvt Ltd. The concession was awarded to GR Infraprojects as a result of a bidding process within the Hybrid annuity model. The criteria of the auction is the lowest bid for construction and operation. The project agreement has been concluded with the NHAI for a period of 15 years. The section will be developed under a Build, Rehabilitate, Operate and Transfer basis (Brownfield project). After completion, the maintenance of the project will be done by the project company, for which the NHAI will pay the concessionaire annualized operations and maintenance cost during this period. 40% of the project cost will be funded by the government, under the Hybrid annuity model, while the concessionaire will arrange the balance 60%. The 60% funding will be split in 45:15 bank loan to sponsor's equity. During the operation period, NHAI will pay concessionaire this 60% in semi-annuity, along with interest thereon and maintenance costs. The project is estimated to cost Rs 1,444 crore ($222.5 million as per estimated FC date). Financial closure was reported by press release of CARE ratings. GR Infraprojects Limited (Factiva) - press release mentions that FC for this particular project has been achieved. However, exact date is not available, and estimated here to be April 2017. Sponsor: GR Infraprojects |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Government |
Article published date | 2024-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in India
- Mundra Ultra Mega Power Plant Gujarat
- ONGC Tripura Power Plant
- Salaya Power Project Gujarat
- Cable-stayed bridge project in the Chambal River
- Construction services for the wellness center component of NexusPark for the Columbus Regional Health and the City of Columbus in Indiana (United States)
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- Mytrah Energy Limited- 100.3MW Savalsang Windfarm
