logo
ProjectBidding

Phase 1 Landfill Closure Grading

Bidding · British Columbia · Last reported Apr 2024

Source: Dodge USA

Work includes Phase 1 Landfill Closure area grading including supply of structural grading materials; leachate control berm construction including supply of structural materials; removing debris from Phase 1 West Pump Chamber; construction of landfill gas system extension with owner supplied pipe and fittings; construction of leachate and stormwater systems with owner supplied pipe and fittings; c

Status
Prospective
Sector
Commercial, Government, Manufacturing (Industrial), Water Supply and Storage
Location
Prince Rupert, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Phase 1 Landfill Closure Grading

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Phase 1 Landfill Closure Grading” is an infrastructure initiative in the Commercial sector, located in Prince Rupert, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work includes Phase 1 Landfill Closure area grading including supply of structural grading materials; leachate control berm construction including supply of structural materials; removing debris from Phase 1 West Pump Chamber; construction of landfill gas system extension with owner supplied pipe and fittings; construction of leachate and stormwater systems with owner supplied pipe and fittings; construction of stormwater ditches including supply of riprap materials; install piping components...

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Prince Rupert

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Government, Manufacturing (Industrial), Water Supply and Storage

Article published date

2024-07-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project