Phase 15 Sanitary Sewer Rehabilitations
Closed · Massachusetts · Last reported Jan 2024
Source: Dodge USA
The scope of work of the Base Bid includes installation of approximately: 28 linear feet of open cut point repairs of 8" sanitary sewers at three (3) locations; replacement of seven (7) service wyes with 140 linear feet of building connections; removal and disposal of 50 linear feet of asbestos cement pipe; installation of two (2) precast concrete sewer manholes; 1,004 linear feet of root treatmen
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Cement, Waste Processing and Treatment, Government
- Location
- Arlington, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Phase 15 Sanitary Sewer Rehabilitations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work of the Base Bid includes installation of approximately: 28 linear feet of open cut point repairs of 8" sanitary sewers at three (3) locations; replacement of seven (7) service wyes with 140 linear feet of building connections; removal and disposal of 50 linear feet of asbestos cement pipe; installation of two (2) precast concrete sewer manholes; 1,004 linear feet of root treatment; root treatment of two (2) sewer manholes; 209 linear feet of sewer mainline cleaning, inspecti... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Arlington |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Cement, Waste Processing and Treatment, Government |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
