Phase 2 Water Main Replacement Project
Sector: Water Supply and Storage • Location: Prairie City, Iowa, United States of America
Source: Dodge USA
The improvements include approximately: 3,829 LF of trenchless 8 diameter water main; 61 water service connections; 12 fire hydrant assemblies; 26 valves; 213 LF of PVC storm sewer replacement; 215 SY of full depth HMA pavement patches; 295 SY of PCC sidewalk; 174 SY of PCC driveways; and 203 SY of granular driveways. Other associated improvements include, fittings, appurtenances, ADA compliant la
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The improvements include approximately: 3,829 LF of trenchless 8 diameter water main; 61 water service connections; 12 fire hydrant assemblies; 26 valves; 213 LF of PVC storm sewer replacement; 215 SY of full depth HMA pavement patches; 295 SY of PCC sidewalk; 174 SY of PCC driveways; and 203 SY of granular driveways. Other associated improvements include, fittings, appurtenances, ADA compliant landings and ramps, traffic control, erosion control, surface restoration, and miscellaneous work n... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
