Phase 3 Boardwalk District Trails
Closed · Texas · Last reported Dec 2024
Source: Dodge USA
The construction of a 12-foot-wide trail system around a detention pond, and a new trail extension connecting the existing trails to Kingsland Boulevard, including all labor, equipment, material, and incidentals required for the project.
- Status
- Closed
- Sector
- Commercial, Rail, Government, Mass Transit
- Location
- Katy, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Phase 3 Boardwalk District Trails
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The construction of a 12-foot-wide trail system around a detention pond, and a new trail extension connecting the existing trails to Kingsland Boulevard, including all labor, equipment, material, and incidentals required for the project. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Katy |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Rail, Government, Mass Transit |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
