logo
ProjectClosed

Phase 3 Boardwalk District Trails

Closed · Texas · Last reported Dec 2024

Source: Dodge USA

The construction of a 12-foot-wide trail system around a detention pond, and a new trail extension connecting the existing trails to Kingsland Boulevard, including all labor, equipment, material, and incidentals required for the project.

Status
Closed
Sector
Commercial, Rail, Government, Mass Transit
Location
Katy, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Phase 3 Boardwalk District Trails

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Phase 3 Boardwalk District Trails” is an infrastructure initiative in the Commercial sector, located in Katy, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The construction of a 12-foot-wide trail system around a detention pond, and a new trail extension connecting the existing trails to Kingsland Boulevard, including all labor, equipment, material, and incidentals required for the project.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Katy

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Rail, Government, Mass Transit

Article published date

2025-01-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project