Phase 3 Offsite Sewer & Lift Station Imprv REBID
Sector: Water Supply and Storage • Location: Carrollton, Texas, United States of America
Source: Dodge
Offsite Sanitary Sewer & Lift Station/Meter Station Improvements, approximately 12,912 LF of 24 sanitary sewer and 16 force main, and 120 LF 36 steel encased aerial creek crossing with reinforced concrete pier supports, all per NCTCOG, Construction Plans, and City of Ferris specifications to serve 260 lots on approximately 59 acres. The project is located East of the intersection of F.M. 664 and T
- Status
- Closed
- Sector
- Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Commercial, Steel, Cement, Government, Metal
- Location
- Carrollton, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Phase 3 Offsite Sewer & Lift Station Imprv REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Offsite Sanitary Sewer & Lift Station/Meter Station Improvements, approximately 12,912 LF of 24 sanitary sewer and 16 force main, and 120 LF 36 steel encased aerial creek crossing with reinforced concrete pier supports, all per NCTCOG, Construction Plans, and City of Ferris specifications to serve 260 lots on approximately 59 acres. The project is located East of the intersection of F.M. 664 and Tanner Farm Rd. in City of Ferris ETJ, Ellis County, Texas. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Carrollton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Commercial, Steel, Cement, Government, Metal |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
