Phase 3-US 64 Road Reconstruction and Bridge Replacement
Sector: Bridge • Location: New Mexico, United States of America
Source: New Mexico Department of Transportation (NMDOT)
The NMDOT is designing Phase 3 (milepost 8.1 to 11.4) of the US 64 Corridor between Shiprock and the Arizona Border. Proposed improvements will include road reconstruction, widening of shoulders, replacement of the bridge at Shiprock Wash, drainage structure improvements, scour protection, and construction of roadside barriers.
- Status
- Prospective
- Sector
- Bridge, Road, Government, Waste Processing and Treatment
- Location
- New Mexico, United States of America
- Updated
- 19 Nov 2026
- Source
- New Mexico Department of Transportation (NMDOT)
ConstructChat
Ask ConstructChat about Phase 3-US 64 Road Reconstruction and Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | study and design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The NMDOT is designing Phase 3 (milepost 8.1 to 11.4) of the US 64 Corridor between Shiprock and the Arizona Border. Proposed improvements will include road reconstruction, widening of shoulders, replacement of the bridge at Shiprock Wash, drainage structure improvements, scour protection, and construction of roadside barriers. |
Location
Country | United States of America (USA) |
State | New Mexico |
Source
Source | New Mexico Department of Transportation (NMDOT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government, Waste Processing and Treatment |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
