Phase-4 Green Line Extension Tunnels
Sector: Mass Transit • Location: New Delhi, Delhi, India
Source: Hindustan Times
The Delhi Metro Rail Corporation (DMRC) has floated a tender for the design and construction of underground tunnels and four underground metro stations as part of the Phase-4 Green Line extension from Inderlok to Indraprastha. The project includes a 12.3km extension with 10 stations, mostly underground, and aims to complete the work within 42 months after the tender is awarded.
- Status
- Prospective
- Sector
- Mass Transit, Rail, Government
- Location
- New Delhi, Delhi, India
- Updated
- 22 Jul 2026
- Source
- Hindustan Times
ConstructChat
Ask ConstructChat about Phase-4 Green Line Extension Tunnels
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Delhi Metro Rail Corporation (DMRC) has floated a tender for the design and construction of underground tunnels and four underground metro stations as part of the Phase-4 Green Line extension from Inderlok to Indraprastha. The project includes a 12.3km extension with 10 stations, mostly underground, and aims to complete the work within 42 months after the tender is awarded. |
Original sector | Transportation |
Budget |
Location
Country | India |
State | Delhi |
City | New Delhi |
Source
Source | Hindustan Times |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail, Government |
Article published date | 2025-11-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in India
- Dabhol Power Plant Ratnagiri District Maharashtra India
- Mundra Ultra Mega Power Plant
- Mumbai Nasik Expressway Limited
- Nardhana ROB (Railway over Bridge)
- Essar Iron Ore Port Terminal Modernization
- Pipavav Railways Corporation Limited
- Vidarbha Industries Power Limited
- Dausa - Lalsot - Kauthun section of NH-11 A
