Phase 5 - US 64 Road Reconstruction
The status, timeline and source of this project. A free account opens every field.
Source: New Mexico Department of Transportation (NMDOT)
The NMDOT is designing Phase 5 (milepost 17.5 to 20.8) of the US 64 Corridor between Shiprock and the Arizona Border. Proposed improvements will include road reconstruction, widening of shoulders, the addition of turn lanes and lighting at major intersections, drainage structure improvements, scour protection, and replacement of the Rattlesnake Wash bridge.
- Status
- Prospective
- Sector
- Bridge, Road, Government, Waste Processing and Treatment
- Location
- New Mexico, United States of America
- Updated
- 19 Nov 2026
- Source
- New Mexico Department of Transportation (NMDOT)
ConstructChat
Ask ConstructChat about Phase 5 - US 64 Road Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | study and design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The NMDOT is designing Phase 5 (milepost 17.5 to 20.8) of the US 64 Corridor between Shiprock and the Arizona Border. Proposed improvements will include road reconstruction, widening of shoulders, the addition of turn lanes and lighting at major intersections, drainage structure improvements, scour protection, and replacement of the Rattlesnake Wash bridge. |
Location
Country | United States of America (USA) |
State | New Mexico |
Source
Source | New Mexico Department of Transportation (NMDOT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government, Waste Processing and Treatment |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
