logo

Phase 6 of Oasis de Atacama - Elena Battery Storage Project

Sector: Solar • Location: Chile

Source: Renewable Energy Magazine

Project
Planned

Phase 6 of the Oasis de Atacama solar farm in Chile, known as 'Elena', involves the installation of 3.5 GWh of battery storage capacity and includes 446 MW of solar power. The project aims to deploy batteries to store solar energy from the existing plant and the electricity grid, enhancing integration into the Chilean electricity system. The battery supply is provided by BYD Energy Storage, with 6

Status
Prospective
Sector
Solar, Energy Storage, Raw Materials, Power Generation (CCGT), Residential, Commercial
Location
Chile
Updated
22 Jul 2026
Source
Renewable Energy Magazine

ConstructChat

Ask ConstructChat about Phase 6 of Oasis de Atacama - Elena Battery Storage Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Phase 6 of Oasis de Atacama - Elena Battery Storage Project” is an infrastructure initiative in the Solar sector, located in Chile. Taiyo aggregates data on it from Renewable Energy Magazine.

Participants

Company

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Phase 6 of the Oasis de Atacama solar farm in Chile, known as 'Elena', involves the installation of 3.5 GWh of battery storage capacity and includes 446 MW of solar power. The project aims to deploy batteries to store solar energy from the existing plant and the electricity grid, enhancing integration into the Chilean electricity system. The battery supply is provided by BYD Energy Storage, with 6,240 units of MC Cube T model batteries.

Original sector

Energy

Budget

Location

Country

Chile

Source

Source

Renewable Energy Magazine

URL

More Details

Record type

Project

Sector

Solar, Energy Storage, Raw Materials, Power Generation (CCGT), Residential, Commercial

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project