Phase I -Ocean Springs Condominium Development
Sector: Bridge • Location: Ocean Springs, Mississippi, United States of America
Source: Dodge USA
PHASE 1: 6 Stories with 140 units - swimming pool - splash park - clubhouse - beach front facilities - courtyard with fire pit and grilling stations - marina with boat slips with public access - fitness center - putting green to be located on 7 acres of land just south of Highway 90 and Fronting Front Beach Drive at the foot of the US Highway 90 Bridge crossing Biloxi Bay
- Status
- Prospective
- Sector
- Bridge, Seaport, Residential, Car parking, Road, Automotive, Commercial, Manufacturing (Industrial)
- Location
- Ocean Springs, Mississippi, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Phase I -Ocean Springs Condominium Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | PHASE 1: 6 Stories with 140 units - swimming pool - splash park - clubhouse - beach front facilities - courtyard with fire pit and grilling stations - marina with boat slips with public access - fitness center - putting green to be located on 7 acres of land just south of Highway 90 and Fronting Front Beach Drive at the foot of the US Highway 90 Bridge crossing Biloxi Bay |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Ocean Springs |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Seaport, Residential, Car parking, Road, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
