Phase I Wastewater Management for Environmental Restoration and Water Security in the Bogota River Basin
Sector: Water Supply and Storage • Location: Colombia
Source: World Bank Group
The proposed operation supports the Government of Colombia’s program to restore water quality and strengthen water security in the Bogota River basin through the development of the Canoas Wastewater Treatment Plant (WWTP) under an innovative US$1.8 billion Design-Build-Operate-Transfer concession. The Multiphase Programmatic Approach (MPA) will significantly expand treatment capacity in Bogota and
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | pipeline |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed operation supports the Government of Colombia’s program to restore water quality and strengthen water security in the Bogota River basin through the development of the Canoas Wastewater Treatment Plant (WWTP) under an innovative US$1.8 billion Design-Build-Operate-Transfer concession. The Multiphase Programmatic Approach (MPA) will significantly expand treatment capacity in Bogota and surrounding municipalities for 7.3 million direct beneficiaries (or 14 percent of Colombia's population). The MPA constitutes a robust One WBG platform—integrating IBRD financing, an IFC corporate loan, and the mobilization of over US$1.13 billion in private capital. The first phase of the MPA will support EAAB’s modernization plan by strengthening its overall management and technical capacity, and by introducing innovations in water and wastewater management, like the review of regulatory and institutional frameworks to enable scalability of wastewater reuse practices to enhance climate resilience and water security. It will also finance the initial years of the Canoas WWTP construction under the concession contract. The project will improve pollution control and contribute to basin-wide water security, more efficient resource use, and long-term environmental restoration objectives. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
