Phase II Transmission System Strengthening Project in Rajasthan
Sector: Solar • Location: Rajasthan, India
Source: Mercomindia.com
A transmission system strengthening program in solar-rich Rajasthan aimed at evacuating 8.1 GW of renewable power. The project includes Phase II (Parts E, G, and G1) components that were scheduled for completion in November 2023 and September 2024 but remain uncommissioned, causing bottlenecks in power evacuation.
- Status
- Failure
- Sector
- Solar, Power Generation (CCGT)
- Location
- Rajasthan, India
- Updated
- 22 Jul 2026
- Source
- Mercomindia.com
ConstructChat
Ask ConstructChat about Phase II Transmission System Strengthening Project in Rajasthan
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A transmission system strengthening program in solar-rich Rajasthan aimed at evacuating 8.1 GW of renewable power. The project includes Phase II (Parts E, G, and G1) components that were scheduled for completion in November 2023 and September 2024 but remain uncommissioned, causing bottlenecks in power evacuation. |
Original sector | Energy |
Location
Country | India |
State | Rajasthan |
Source
Source | Mercomindia.com |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT) |
Article published date | 2025-09-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
