Pheasant Road Improvements
One of 10,000+ projects Taiyo tracks in Pennsylvania.
Source: Dodge USA
This work will consist of all labor, equipment, and materials needed for full width mill and overlay of approximately 600 SY on Pheasant Road. Construction of a roadside drainage swale, approximately 200 LF in length, will be included in the work to improve the drainage of runoff from Pheasant Road.
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial)
- Location
- Bechtelsville, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pheasant Road Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This work will consist of all labor, equipment, and materials needed for full width mill and overlay of approximately 600 SY on Pheasant Road. Construction of a roadside drainage swale, approximately 200 LF in length, will be included in the work to improve the drainage of runoff from Pheasant Road. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Bechtelsville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
