logo

Pheonix PHES Project at Burrendong Dam

Sector: Water Supply and Storage • Location: New South Wales, Australia

Source: Energy-Storage.News

Project
Planned

The Pheonix PHES project at Burrendong Dam is an 800MW pumped hydro project with a 15-hour duration, estimated to cost around AU$1.8 billion. It will feature a purpose-built off-stream upper and lower storage reservoir connected by a tunnel to a powerhouse.

Status
Prospective
Sector
Water Supply and Storage, Tunnel, Hydro
Location
New South Wales, Australia
Updated
22 Jul 2026
Source
Energy-Storage.News

ConstructChat

Ask ConstructChat about Pheonix PHES Project at Burrendong Dam

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pheonix PHES Project at Burrendong Dam” is an infrastructure initiative in the Water Supply and Storage sector, located in New South Wales, Australia. Taiyo aggregates data on it from Energy-Storage.News.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Pheonix PHES project at Burrendong Dam is an 800MW pumped hydro project with a 15-hour duration, estimated to cost around AU$1.8 billion. It will feature a purpose-built off-stream upper and lower storage reservoir connected by a tunnel to a powerhouse.

Original sector

Energy

Budget

Location

Country

Australia

State

New South Wales

Source

Source

Energy-Storage.News

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Tunnel, Hydro

Article published date

2025-04-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project