Philippines 1.1-Gigawatt LNG-to-Power Project Cancellation
The status, timeline and source of this project. A free account opens every field.
Source: The Energy Mix
The Philippines cancelled a 1.1-gigawatt LNG-to-power project backed by U.S. financial behemoth Blackstone due to a chronic shortage of gas turbines needed to generate electricity from LNG. The country is unlikely to add new import capacity with existing terminals running below capacity.
- Status
- Closed
- Sector
- Power Generation (CCGT), LNG
- Location
- Philippines
- Updated
- 22 Jul 2026
- Source
- The Energy Mix
ConstructChat
Ask ConstructChat about Philippines 1.1-Gigawatt LNG-to-Power Project Cancellation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Philippines cancelled a 1.1-gigawatt LNG-to-power project backed by U.S. financial behemoth Blackstone due to a chronic shortage of gas turbines needed to generate electricity from LNG. The country is unlikely to add new import capacity with existing terminals running below capacity. |
Original sector | Energy |
Location
Country | Philippines |
Source
Source | The Energy Mix |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), LNG |
Article published date | 2025-12-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
