Philippines: Manila Metro Rail Transit Line 4 (MRT4) Project
Proposed · Philippines
Source: Asian Infrastructure Investment Bank (AIIB)
The Program will support the construction of a high-capacity railway mass transit system intended to serve the eastern side of Metro Manila from the Epifanio de los Santos Avenue (EDSA)-Ortigas Ave. Junction to Taytay in Rizal Province (i.e., the MRT4 Line). The system will include an elevated viaduct of 12.7 km and 10 stations; and has a barrier-free design to allow inclusive access. The Phase 1
- Status
- Prospective
- Sector
- Water Supply and Storage, Mass Transit, Commercial, Biomass, Rail, Bridge, Automotive, Waste Processing and Treatment, Government
- Location
- Philippines
- Updated
- 22 Jul 2026
- Source
- Asian Infrastructure Investment Bank (AIIB)
ConstructChat
Ask ConstructChat about Philippines: Manila Metro Rail Transit Line 4 (MRT4) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Program will support the construction of a high-capacity railway mass transit system intended to serve the eastern side of Metro Manila from the Epifanio de los Santos Avenue (EDSA)-Ortigas Ave. Junction to Taytay in Rizal Province (i.e., the MRT4 Line). The system will include an elevated viaduct of 12.7 km and 10 stations; and has a barrier-free design to allow inclusive access. The Phase 1 of the Program (the Project) will be jointly co-financed by the Asian Development Bank (ADB) and the Asian Infrastructure Investment Bank (AIIB) to provide a portion of the Program's total cost. |
Original sector | Transport |
Budget |
Location
Country | Philippines |
Source
Source | Asian Infrastructure Investment Bank (AIIB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Commercial, Biomass, Rail, Bridge, Automotive, Waste Processing and Treatment, Government |
Article published date | 2025-06-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
