Philippines: Metro Manila Sponge City Project
One of 10,000+ projects Taiyo tracks in Philippines.
Source: aiib
The Project will finance integrated stormwater-management systems that combine blue-green and complementary gray measures to retain, detain, infiltrate, treat and safely discharge stormwater closer to where it falls in selected areas of Metro Manila, complementing existing drainage, pumping and flood-control infrastructure. Investments will be implemented in successive batches under a framework ap
- Status
- Prospective
- Sector
- Water Supply and Storage, Mass Transit, Road
- Location
- Philippines
- Updated
- 19 Nov 2026
- Source
- aiib
ConstructChat
Ask ConstructChat about Philippines: Metro Manila Sponge City Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Project will finance integrated stormwater-management systems that combine blue-green and complementary gray measures to retain, detain, infiltrate, treat and safely discharge stormwater closer to where it falls in selected areas of Metro Manila, complementing existing drainage, pumping and flood-control infrastructure. Investments will be implemented in successive batches under a framework approach, starting with the first batch of five sites from a ranked long list of about 39 candidate sites. Subsequent batches will be cleared against agreed eligibility, readiness and environmental and social (E&S) criteria. The Project comprises three components: Component 1: Integrated Sponge City Infrastructure. Site-based blue-green infrastructure (such as retention landscapes, floodable parks, bioretention areas, swales, green corridors and wetlands), distributed detention, retention and infiltration, and complementary gray infrastructure and drainage interfaces. Component 2: Technical Standards, O&M and Institutional Sustainability. Consulting services, goods and training for community engagement and gender-responsive design; technical assistance on regulatory and procedural measures, operation and maintenance (O&M) standards, costed O&M plans and operator training; an asset-management system and essential maintenance equipment; hydrological monitoring and model validation; and assessments to inform replication and scaling. Component 3: Project Management and Engineering Support. A Project Management and Engineering Consultancy to prepare subsequent investments, designs and tender documents and to supervise construction; independent technical assurance and results verification; and a Metropolitan Sponge City Integration and Scaling Strategy. |
Original sector | Water |
Budget |
Location
Country | Philippines |
Source
Source | aiib |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Road |
Article published date | 2026-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
