logo
ProjectClosed

Philippines: Northwind Bangui Bay Project

Sector: Solar • Location: Philippines

Source: World Bank Group

This North Wind Bangui Bay Project for Philippines will contribute to the country's development objectives of sustainable economic development through the enhancement of both quantity and reliability of power supply in an environmentally responsible manner. The project components include: the project is located in the foreshore of Bangui Bay in Ilocos Norte Province. The wind farm project, with to

Status
Closed
Sector
Solar, Power Generation (CCGT), Biomass, Wind, Geothermal, Raw Materials, Government
Location
Philippines
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Philippines: Northwind Bangui Bay Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Philippines: Northwind Bangui Bay Project” is an infrastructure initiative in the Solar sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This North Wind Bangui Bay Project for Philippines will contribute to the country's development objectives of sustainable economic development through the enhancement of both quantity and reliability of power supply in an environmentally responsible manner. The project components include: the project is located in the foreshore of Bangui Bay in Ilocos Norte Province. The wind farm project, with total cost of US$35.45 million, will comprise: (a) fifteen wind turbines of 1,650 kW rated capacity each, totaling 24.75 MW. Annual energy production is estimated to be about 74.48 GWh at a capacity factor of 34 percent; and (b) construction of a 50 km 69kV overhead transmission line to deliver the power to the switchyard of the offtaker, in Laoag city. The Engineering and Procurement Contract (EPC) of about $31 million for a turnkey installation of power plant, substation and transmission line has been awarded to NEG Micon. Considering the wind farm costs alone, the installed cost is about $1,186 per kW. Counting all project costs, the installed cost is about $1,400 per kW. This is still in the middle of the cost range of recent experience for 25 MWscale wind projects. All power produced will be sold to the Ilocos Norte Electric Cooperative (INEC) through an Electricity Sales Agreement (ESA) signed in 2002. INEC has the exclusive franchise to distribute electricity in the area.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Philippines

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Biomass, Wind, Geothermal, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project