logo

Phoenix Lake Integrated Regional Water Management Retrofit Project

Sector: Government • Location: California, United States of America

Source: Marin County Department of Public Works (DPW)

Project
Active

The study that evaluated what improvements are needed to the dam concluded that the cost and schedule of the improvements would not meet the requirements of the Proposition 1E grant. We completed the feasibility assessment phase for the project and in 2018 determined it to be infeasible within the project constraints, timeline and budget. Studies prepared include: Phoenix Lake is owned and operate

Project Information FAQ

Project Information

5 Q
The project “Phoenix Lake Integrated Regional Water Management Retrofit Project” is an infrastructure initiative in the Government sector, located in California, United States of America. Taiyo aggregates data on it from Marin County Department of Public Works (DPW).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The study that evaluated what improvements are needed to the dam concluded that the cost and schedule of the improvements would not meet the requirements of the Proposition 1E grant. We completed the feasibility assessment phase for the project and in 2018 determined it to be infeasible within the project constraints, timeline and budget. Studies prepared include: Phoenix Lake is owned and operated as a water supply reservoir by the Marin Municipal Water District. It is open to the public for hiking, mountain biking, fishing, and other recreational uses. The Phoenix Lake Integrated Regional Watershed Management (IRWM) Retrofit project would modify the reservoir to allow it to serve as a detention basin. This would reduce downstream flood risk in lower Ross Valley resulting from creek overflow during storms. Other related benefits include:

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data