logo
ProjectClosed

Phoenix Metropolitan Area Freeway Lighting P3 Project

The status, timeline and source of this project. A free account opens every field.

Source: InfraPPPWorld

The project involves upgrading the Deck Park Tunnel lighting system (approximately 3,300 luminaires) to LED technology to achieve higher luminance level. The Deck Park Tunnel Lighting includes overhead lighting on the eastbound and westbound mainline freeway portion only. The transit bay located between the main tubes and the equipment rooms on the north and south sides of the tunnel are not cover

Status
Closed
Sector
Road, Tunnel, Government
Location
United States of America
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Phoenix Metropolitan Area Freeway Lighting P3 Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Phoenix Metropolitan Area Freeway Lighting P3 Project” is an infrastructure initiative in the Road sector, located in (USA) United States of America. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves upgrading the Deck Park Tunnel lighting system (approximately 3,300 luminaires) to LED technology to achieve higher luminance level. The Deck Park Tunnel Lighting includes overhead lighting on the eastbound and westbound mainline freeway portion only. The transit bay located between the main tubes and the equipment rooms on the north and south sides of the tunnel are not covered in the scope of work. The Deck Park Tunnel lighting is on 24 hours per day and load varies by time of day based on outdoor ambient light levels.Outside of the Deck Park Tunnel, the project includes upgrading approximately 16,000 luminaires lighting the freeway system in the Phoenix metropolitan area (mainline and ramps including any underdeck lighting along the freeway mainline where the freeway passes under an overhead structure). Open road lighting currently operates approximately 4,200 hours per year.The project will also include maintenance of poles, wiring, pull boxes, conduit, and other ancillary lighting infrastructure on the load side of the electrical point of service, and periodic cleaning of the walls of the Deck Park Tunnel.

Original sector

Social & Health, Transport

Procurement method

Location

Country

United States of America (USA)

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Road, Tunnel, Government

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project