logo

Phoenix Metropolitan Area Freeway Lighting P3 Project

Sector: Car parking • Location: United States of America

Source: InfraPPPWorld

Project
Project In Tender

The project involves upgrading the Deck Park Tunnel lighting system (approximately 3,300 luminaires) to LED technology to achieve higher luminance level. The Deck Park Tunnel Lighting includes overhead lighting on the eastbound and westbound mainline freeway portion only. The transit bay located between the main tubes and the equipment rooms on the north and south sides of the tunnel are not cover

Project Information FAQ

Project Information

5 Q
The project “Phoenix Metropolitan Area Freeway Lighting P3 Project” is an infrastructure initiative in the Car parking sector, located in United States of America. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project in tender

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves upgrading the Deck Park Tunnel lighting system (approximately 3,300 luminaires) to LED technology to achieve higher luminance level. The Deck Park Tunnel Lighting includes overhead lighting on the eastbound and westbound mainline freeway portion only. The transit bay located between the main tubes and the equipment rooms on the north and south sides of the tunnel are not covered in the scope of work. The Deck Park Tunnel lighting is on 24 hours per day and load varies by time of day based on outdoor ambient light levels. Outside of the Deck Park Tunnel, the project includes upgrading approximately 16,000 luminaires lighting the freeway system in the Phoenix metropolitan area (mainline and ramps including any underdeck lighting along the freeway mainline where the freeway passes under an overhead structure). Open road lighting currently operates approximately 4,200 hours per year. The project will also include maintenance of poles, wiring, pull boxes, conduit, and other ancillary lighting infrastructure on the load side of the electrical point of service, and periodic cleaning of the walls of the Deck Park Tunnel.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data