Phoenix-SB 1530 Infrastructure Improvements
Sector: Water Supply and Storage • Location: Phoenix, Oregon, United States of America
Source: Dodge
construction of the SB 1530 Infrastructure Improvements project. Work to be performed includes, but is not limited to: the construction of approximately 500 linear feet of new roadway intersecting the east side of the existing Grove Road. This work will involve excavation, backfill and grading, subgrade preparation, and sitework. Additionally, utilities such as manholes, gravel surfaces, and conne
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Commercial
- Location
- Phoenix, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Phoenix-SB 1530 Infrastructure Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | construction of the SB 1530 Infrastructure Improvements project. Work to be performed includes, but is not limited to: the construction of approximately 500 linear feet of new roadway intersecting the east side of the existing Grove Road. This work will involve excavation, backfill and grading, subgrade preparation, and sitework. Additionally, utilities such as manholes, gravel surfaces, and connections to existing water, sewer, and storm systems will be installed, along with any other necess... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Phoenix |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Commercial |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
