Phosphate 3 Plant Expansion
Sector: Manufacturing (Industrial) • Location: Saudi Arabia
Source: ZAWYA
Saudi Arabian Mining Company (Ma’aden) plans to spend between 8.6 billion to 10.6 billion Saudi riyals ($2.3-$2.8 billion) in capital expenditure in 2025, with around 70% allocated for growth capex. Phase one of the Phosphate 3 mega-complex is expected to be completed by the end of 2026, with production starting in 2027 and reaching full capacity by the end of 2027.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Fertilizers
- Location
- Saudi Arabia
- Updated
- 22 Jul 2026
- Source
- ZAWYA
ConstructChat
Ask ConstructChat about Phosphate 3 Plant Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Saudi Arabian Mining Company (Ma’aden) plans to spend between 8.6 billion to 10.6 billion Saudi riyals ($2.3-$2.8 billion) in capital expenditure in 2025, with around 70% allocated for growth capex. Phase one of the Phosphate 3 mega-complex is expected to be completed by the end of 2026, with production starting in 2027 and reaching full capacity by the end of 2027. |
Original sector | Mining |
Budget |
Location
Country | Saudi Arabia |
Source
Source | ZAWYA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Fertilizers |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in Saudi Arabia
- Rabigh2 CombinedCycle Power Plant
- Fadhili GasFired Combined Heat and Power CHP Plant
- Yanbu III Power Plant
- Khurais Central Processing Facilities
- Saudi Arabia Ethane Deep Recovery Facility
- Al-Sanabil 380KV Substation
- Al Khafji Solar Saline Water Reverse Osmosis (Solar SWRO) Desalination Plant
- Fadhili Gas Plant, Jubail
