Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar 2 (PREDICTS2)
Sector: Manufacturing (Industrial) • Location: United States of America
Source: Grants.gov
The Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar 2 (PREDICTS 2) funding opportunity announcement (FOA) seeks research and development projects that will advance the reliability and durability of solar photovoltaic (PV) technologies. Eligible projects will examine the performance of PV modules and will develop accelerated tests to better understand how sola
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Solar, Government, Commercial, Residential
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Grants.gov
ConstructChat
Ask ConstructChat about Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar 2 (PREDICTS2)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | archived |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar 2 (PREDICTS 2) funding opportunity announcement (FOA) seeks research and development projects that will advance the reliability and durability of solar photovoltaic (PV) technologies. Eligible projects will examine the performance of PV modules and will develop accelerated tests to better understand how solar modules degrade over time and achieve improved lifetime performance of the modules. Key focus areas will include using physics and chemistry and advanced data analysis to gain a better understanding of why solar modules fail, developing improved product tests and new rapid testing techniques or instruments ? either outdoors after installation or during the manufacturing process ? that evaluate module reliability, and improving data models to predict performance over time. These projects will directly support SunShot?s mission to cut the cost of solar energy technologies and increase widespread deployment of safe, reliable and efficient solar electricity nationwide. The total federal funding for this opportunity will be approximately $9.7 million with a minimum 20% required awardee cost share. Individual awards will likely range from $500,000 to $1,500,000. The full Funding Opportunity Announcement (FOA) is posted on the EERE eXCHANGE website at https://eere-exchange.energy.gov. Applications must be submitted through the EERE eXCHANGE website to be considered for award. The applicant must first register and create an account on the EERE eXCHANGE website. A User Guide for the EERE eXCHANGE can be found on the EERE website https://eere- exchange.energy.gov/Manuals.aspx after logging in to the system. Information on where to submit questions regarding the content of the announcement and where to submit questions regarding submission of applications is found in the full FOA posted on the EERE eXCHANGE website. |
Budget |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Grants.gov |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Solar, Government, Commercial, Residential |
Article published date | 2023-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
