PI Building / STGO
Closed · Argentina · Last reported Aug 2024
Source: ArchDaily
The ground floor reflects the minimal conditions of the plot. Despite this, a large communal space was designed—a pedestrian street with a continuous and reflective plane that conceals all services, inviting people to walk and discover the different uses calmly and fluidly. In the center, a garden serves as a meeting point, isolating from the noise of the street while harmoniously integrating natu
- Status
- Closed
- Sector
- Road, Metal, Commercial, Residential
- Location
- Argentina
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about PI Building / STGO
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The ground floor reflects the minimal conditions of the plot. Despite this, a large communal space was designed—a pedestrian street with a continuous and reflective plane that conceals all services, inviting people to walk and discover the different uses calmly and fluidly. In the center, a garden serves as a meeting point, isolating from the noise of the street while harmoniously integrating nature with the built environment.An essential aspect of the project was the incorporation of flexible spaces and a wide variety of typologies, responding to the slope of the plot and variations in width. The importance of adapting to the changing needs of residents, both in terms of use and lifestyle, was recognized.According to the plot's urban certificates, it was possible to construct a ground floor plus six floors. Given that San Juan Street is an urban corridor, an exceptional height of eleven floors was allowed. However, due to the plot's minimum width, which did not allow vehicular access, the project had to adapt to the internal plot indicators, limiting construction to the ground floor plus four floors.Given its urban condition, the facade grille serves protective and security functions and becomes a skin that contributes to the identity and preserves the building's image. The 3.14-meter front is divided into three white metal doors, each one meter wide, accommodating services and the main entrance. It is highlighted by a circular window that provides views from inside to outside and vice versa before entering or exiting.Text description provided by the architects.The Pi Building is on an unconventional and atypical plot in the city center ofRosario. Its name refers to its exceptionally narrow front, measuring only 3.14 meters.For many years, this small plot remained abandoned, lacking interest due to its size and complexity in carrying out a collective housing project. However, faced with this challenge, there was a need to conceive a building that could make the most of the available space while meeting high standards of habitability, functionality, and safety. |
Location
Country | Argentina |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Road, Metal, Commercial, Residential |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
