logo
ProjectClosed

PI59 Offices / V8 Architects

The status, timeline and source of this project. A free account opens every field.

Source: ArchDaily

Text description provided by the architects.Amsterdam’s Zuidas has something of a dual character. Colossal offices on the south side of the A10, and terraced houses on the north side. In the middle, there is a building from the 1970s, designed as an office, that is used as a school and which we are bringing back to its original function. However, it will become the ‘best-in-class office building’,

Status
Closed
Sector
Cement, Car parking, Residential, Commercial, Warehouse, Automotive
Location
Netherlands
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about PI59 Offices / V8 Architects

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “PI59 Offices / V8 Architects” is an infrastructure initiative in the Cement sector, located in Amsterdam. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Text description provided by the architects.Amsterdam’s Zuidas has something of a dual character. Colossal offices on the south side of the A10, and terraced houses on the north side. In the middle, there is a building from the 1970s, designed as an office, that is used as a school and which we are bringing back to its original function. However, it will become the ‘best-in-class office building’, because the city, neighborhood, location and building demand this. We felt duty-bound to do this.Although the existing building stands independently on its plot of land, it is part of a large family of buildings in the linear zone between the high-rise buildings of Zuidas and the low-rise residential buildings on the north side. Although each building has its character, they share an important value, namely the green strip that surroundings all of the buildings and connects them to each other. On a larger scale, this strip also forms a green buffer between the two urban settings. With the redevelopment, the free space around the building is designed as a garden, which glorifies the unique position of PI59 as a villa in the park.PI59 adds a highly distinctive office building to Zuidas. Exceptionally large floor spaces of more than 3,000 m2 and the restriction of the height to a low-rise building (six floors), offer a shell for an ultimately comfortable work environment. The large quantity of daylight, good arrangement, fresh air, flexible division, and varied spatial typology offers the best conditions for all kinds of activities. The building has been designed based on various progressive benchmarks, such as BREEAM, WiredScore, RE \ DEFINE and Net Zero Carbon, thus committing to the climate goals of the Paris Agreement and resulting in the “best in-class-office building”.The existing concrete facade, with its pronounced brutalist character, is replaced with a facade that is the polar opposite in many respects. An open grid makes the building inviting instead of closed. Large windows with curved glass make the building transparent instead of dark. Bronze ornaments make the building refined instead of rough. Polished concrete with additional natural stone makes the building lively instead of dead. However, we use all of these elements to ensure that the solid character echoes its original character. Elegant brutalism.

Location

Country

Netherlands

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Cement, Car parking, Residential, Commercial, Warehouse, Automotive

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project