logo
ProjectBid Results

PIA Passenger Boarding Bridge Replacement Phase 2

Sector: Bridge • Location: Portland, Oregon, United States of America

Source: Dodge USA

Removing and disposing of existing passenger boarding bridges (PBBs) at Gates C4, D4, C23, and D15; providing new PBBs and associated equipment to replace the removed PBBs; removing and reinstalling various elements of PBB equipment at these gates; and furnishing new PBBs and associated equipment for Gates B1, C3, D3, and E1 for installation by others under a separate contract. The work includes i

Status
Closed
Sector
Bridge, Power Generation (CCGT), Airport, Road, Government, Commercial
Location
Portland, Oregon, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about PIA Passenger Boarding Bridge Replacement Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PIA Passenger Boarding Bridge Replacement Phase 2” is an infrastructure initiative in the Bridge sector, located in Portland, Oregon, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Removing and disposing of existing passenger boarding bridges (PBBs) at Gates C4, D4, C23, and D15; providing new PBBs and associated equipment to replace the removed PBBs; removing and reinstalling various elements of PBB equipment at these gates; and furnishing new PBBs and associated equipment for Gates B1, C3, D3, and E1 for installation by others under a separate contract. The work includes installation and commissioning of PBBs, ground power units, preconditioned air units, equipment mo...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Oregon

City

Portland

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Power Generation (CCGT), Airport, Road, Government, Commercial

Article published date

2024-06-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project