logo
ProjectClosed

Picayune Baseball Turf

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Project includes partially removing an existing grass field partially disconnecting existing site irrigation system, removal of an existing trench drain along the baseball field, and providing new turf field. The new turf field will include: new bull pens new under turf drainage system to evacuate water to the north and east of the field, and new8 fencing around the bull pens.The turf and striping

Status
Closed
Sector
Water Supply and Storage, Government, Education, Road, Waste Processing and Treatment, Commercial
Location
Picayune, Mississippi, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Picayune Baseball Turf

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Picayune Baseball Turf” is an infrastructure initiative in the Water Supply and Storage sector, located in Picayune, Mississippi, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project includes partially removing an existing grass field partially disconnecting existing site irrigation system, removal of an existing trench drain along the baseball field, and providing new turf field. The new turf field will include: new bull pens new under turf drainage system to evacuate water to the north and east of the field, and new8 fencing around the bull pens.The turf and striping are expected to be regulation and drain properly.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Picayune

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Education, Road, Waste Processing and Treatment, Commercial

Article published date

2025-09-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project