Pickalbatros MAR
Sector: Waste Processing and Treatment • Location: Morocco
Source: International Finance Corporation (IFC)
The proposed investment is a senior, secured, corporate loan package of up to US$200m, comprised of an IFC A Loan of up to US$160m (backed by a 50% MCPP RSU credit insurance cover) and a B-Loan/Parallel Loan of up to US$40m, to part finance the 2026-2029 US$350m investment program of the Pickalbatros Hotels & Resorts Group (“Pickalbatros” or the “Group”). The rest of the investment program will be
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Biomass, Water Supply and Storage, Hotel
- Location
- Morocco
- Updated
- 19 Nov 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Pickalbatros MAR
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pending |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed investment is a senior, secured, corporate loan package of up to US$200m, comprised of an IFC A Loan of up to US$160m (backed by a 50% MCPP RSU credit insurance cover) and a B-Loan/Parallel Loan of up to US$40m, to part finance the 2026-2029 US$350m investment program of the Pickalbatros Hotels & Resorts Group (“Pickalbatros” or the “Group”). The rest of the investment program will be financed by US$150m equity including internal cash generation. Pickalbatros is a leading hospitality development and management group founded by Mr. Kamel Abou-Ali (the “Sponsor”) in 1992, and which owns and manages over 35 hotels and resorts in Egypt (28) and Morocco (7). TheUS$350m investment program will focus on the expansion of Group’s Moroccan expansion and will include (i) the acquisition of two hotels (US$125m), (ii) post-acquisition refurbishing, renovation and greening of new hotels (US$105m), (iii) upgrading and greening of existing hotels (US$65m) and (iv) the refinancing of local medium term debt of selected hotel assets (US$55m) with longer term more sustainable financing (the “Project”). |
Original sector | U-AB - Resort Hotel (Including Lodges) |
Location
Country | Morocco |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Biomass, Water Supply and Storage, Hotel |
Article published date | 2026-05-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Morocco
- Tangier city waste treatment services
- Meknes waste landfill and recycling facility
- Redal S.A. and Amendis S.A.
- Morocco - Drinking Water Quality and Service Improvement Project
- Morocco - Project to Update the Drinking Water Supply in the Rabat-Casablanca Coastal Area
- RECHARGE DE LA NAPPE DU HAOUZ
- Khenifra household waste management
- Agadir Desalination Plant Phase 2
