Pico-Hydro Power Stations on Pentecost Island
Sector: Hydro • Location: Port Vila, Vanuatu
Source: United Nations Development Programme
Construction of three pico-hydro power stations in Waterfall, Melsisi, and Larimaat under the Vanuatu Green Transformation (VGET) Project to provide 24x7 electricity to about 700 households benefiting approximately 3,000 residents directly and 6,000 indirectly, connected by a 32-kilometer electrical network.
- Status
- Under Construction
- Sector
- Hydro, Power Generation (CCGT), Government
- Location
- Port Vila, Vanuatu
- Updated
- 22 Jul 2026
- Source
- United Nations Development Programme
ConstructChat
Ask ConstructChat about Pico-Hydro Power Stations on Pentecost Island
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of three pico-hydro power stations in Waterfall, Melsisi, and Larimaat under the Vanuatu Green Transformation (VGET) Project to provide 24x7 electricity to about 700 households benefiting approximately 3,000 residents directly and 6,000 indirectly, connected by a 32-kilometer electrical network. |
Original sector | Energy |
Location
Country | Vanuatu |
City | Port Vila |
Source
Source | United Nations Development Programme |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Government |
Article published date | 2025-11-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
