Pier & Bulkhead Replacement
Sector: Forest Products and Packaging • Location: Ocean City, Maryland, United States of America
Source: Dodge USA
construct a 625 foot long by 32 foot wide concrete pier with associated wave break and timber fenders and 435 linear feet of replacement bulkhead with associated timber fenders, all within a maximum of 390 feet channelward of the mean high water line. The purpose of the project is to improve navigable access
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Pre-Design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | construct a 625 foot long by 32 foot wide concrete pier with associated wave break and timber fenders and 435 linear feet of replacement bulkhead with associated timber fenders, all within a maximum of 390 feet channelward of the mean high water line. The purpose of the project is to improve navigable access |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
