Pier 15 Rail Realignment
Closed · Ontario · Last reported Mar 2021
Source: Dodge USA
Removal of the reinforced concrete slab, reinforced foundation walls, as required for the installation of the track structure as indicated within the Contract Drawings. Demolition of existing bollards. Demolish existing storm structures and pipe. Demolish water chambers and valve boxes.
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Rail, Mass Transit, Government, Commercial
- Location
- Hamilton, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pier 15 Rail Realignment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Removal of the reinforced concrete slab, reinforced foundation walls, as required for the installation of the track structure as indicated within the Contract Drawings. Demolition of existing bollards. Demolish existing storm structures and pipe. Demolish water chambers and valve boxes. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Hamilton |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Rail, Mass Transit, Government, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
