logo

Pier B On-Dock Rail Support Facility Project

Sector: Rail • Location: United States of America (USA)

Source: ENR News

Project
Under Planning

The City of Long Beach Board of Harbor Commissioners has selected HDR to perform the final design for the Pier B On-Dock Rail Support Facility Project. It aims to reconfigure the 171-acre facility to allow trains up to 10,000 ft long to be loaded and unloaded at on-dock rail facilities at marine terminals, streamline rail operations, remove bottlenecks and reduce the need for local truck trips. It

Project Information FAQ

Project Information

5 Q
The project “Pier B On-Dock Rail Support Facility Project” is an infrastructure initiative in the Rail sector, located in United States of America (USA). Taiyo aggregates data on it from ENR News.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under planning

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The City of Long Beach Board of Harbor Commissioners has selected HDR to perform the final design for the Pier B On-Dock Rail Support Facility Project. It aims to reconfigure the 171-acre facility to allow trains up to 10,000 ft long to be loaded and unloaded at on-dock rail facilities at marine terminals, streamline rail operations, remove bottlenecks and reduce the need for local truck trips. It will eliminate the existing railroad crossing at the Ninth Street and Pico Avenue intersection and reconfigure existing tracks to allow trains to directly connect to the Alameda Corridor. HDR will work with sub-consultant Moffatt & Nichol on the project, which is scheduled to be completed in three phases, with the first phase expected to be completed by 2024.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data