Pier Wind Project
Sector: Warehouse • Location: Long Beach, California, United States
Source: Work Boat
The Pier Wind project is a proposed 400-acre terminal at the Port of Long Beach to assemble and deploy floating offshore wind turbines. It aims to support California's offshore wind energy goals and enhance the electric grid to support electrification investments across the supply chain.
- Status
- Prospective
- Sector
- Warehouse, Power Transmission, Wind, Power Generation (CCGT), Government
- Location
- Long Beach, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Work Boat
ConstructChat
Ask ConstructChat about Pier Wind Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Pier Wind project is a proposed 400-acre terminal at the Port of Long Beach to assemble and deploy floating offshore wind turbines. It aims to support California's offshore wind energy goals and enhance the electric grid to support electrification investments across the supply chain. |
Original sector | Offshore Energy |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Long Beach |
Source
Source | Work Boat |
URL |
More Details
Record type | Project |
Sector | Warehouse, Power Transmission, Wind, Power Generation (CCGT), Government |
Article published date | 2025-11-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
