Pierrefonds Waste-to-Energy Plant Steam Turbine Supply
Sector: Wind • Location: Pierrefonds, France
Source: Global Market Insights Inc.
Doosan Škoda Power signed a deal to supply a 19 MW DST-G10 steam turbine, generator, gearbox, and auxiliary systems for the Pierrefonds waste-to-energy plant on Réunion Island. The facility will process up to 148,000 tons of waste annually, generating 121,000 MWh of electricity. The project includes technical advisory services for construction and commissioning, with equipment delivery scheduled f
- Status
- Closed
- Sector
- Wind, Power Generation (CCGT)
- Location
- Pierrefonds, France
- Updated
- 22 Jul 2026
- Source
- Global Market Insights Inc.
ConstructChat
Ask ConstructChat about Pierrefonds Waste-to-Energy Plant Steam Turbine Supply
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Doosan Škoda Power signed a deal to supply a 19 MW DST-G10 steam turbine, generator, gearbox, and auxiliary systems for the Pierrefonds waste-to-energy plant on Réunion Island. The facility will process up to 148,000 tons of waste annually, generating 121,000 MWh of electricity. The project includes technical advisory services for construction and commissioning, with equipment delivery scheduled for April 2025. |
Original sector | Energy and Power |
Location
Country | France |
City | Pierrefonds |
Source
Source | Global Market Insights Inc. |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT) |
Article published date | 2025-12-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
