Pike Creek Sewer - Phase 5
Sector: Commercial • Location: Poplar Bluff, Missouri, United States of America
Source: Dodge USA
Contract #1 Wastewater Treatment Facility Construction including influent lift station improvements, influent flow measurement and screening, Oxidation Ditch and dual Clarification, Lab/Control Building, UV Disinfection, and other necessary appurtenances for a fully operational wastewater treatment system. Contract #2 Collection System Improvements including 8 and 24 gravity sewer installation, va
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Chemical (Industrial), Waste Processing and Treatment, Government, Manufacturing (Industrial)
- Location
- Poplar Bluff, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pike Creek Sewer - Phase 5
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Contract #1 Wastewater Treatment Facility Construction including influent lift station improvements, influent flow measurement and screening, Oxidation Ditch and dual Clarification, Lab/Control Building, UV Disinfection, and other necessary appurtenances for a fully operational wastewater treatment system. Contract #2 Collection System Improvements including 8 and 24 gravity sewer installation, various sized forcemains, and other appurtenances for fully operational collection system improveme... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Poplar Bluff |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Chemical (Industrial), Waste Processing and Treatment, Government, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
