logo

Piketon Data Center Grid Build-Out

Sector: Data Center • Location: Piketon, Ohio, United States

Source: Simply Wall St

Project
Planned

Multi-billion-dollar plans for 765-kilovolt transmission infrastructure to power a planned 10-gigawatt data center campus at the former Piketon gaseous diffusion plant. SB Energy is funding $4.20 billion of new transmission to limit rate impacts on Ohio residents.

Status
Prospective
Sector
Data Center, Power Generation (CCGT)
Location
Piketon, Ohio, United States of America
Updated
22 Jul 2026
Source
Simply Wall St

ConstructChat

Ask ConstructChat about Piketon Data Center Grid Build-Out

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Piketon Data Center Grid Build-Out” is an infrastructure initiative in the Data Center sector, located in Piketon, Ohio, United States. Taiyo aggregates data on it from Simply Wall St.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Multi-billion-dollar plans for 765-kilovolt transmission infrastructure to power a planned 10-gigawatt data center campus at the former Piketon gaseous diffusion plant. SB Energy is funding $4.20 billion of new transmission to limit rate impacts on Ohio residents.

Original sector

Electric Utilities

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Piketon

Source

Source

Simply Wall St

URL

More Details

Record type

Project

Sector

Data Center, Power Generation (CCGT)

Article published date

2026-03-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project