Piling Relocation at Blackburn Point Park
Sector: Cement • Location: Sarasota, Florida, United States of America
Source: Dodge
Installation of two new eco-pilings, filled with concrete, in accordance with the existing permit plans. Removal of the two existing terminal pilings. Relocation of D-ring attachment points to align with the new piling positions. Replacement of the terminal deck board and fascia to match the existing design and materials.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | bid results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Installation of two new eco-pilings, filled with concrete, in accordance with the existing permit plans. Removal of the two existing terminal pilings. Relocation of D-ring attachment points to align with the new piling positions. Replacement of the terminal deck board and fascia to match the existing design and materials. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
