logo

PILOT GRANT PROGRAM-GA PORTS AUTHORITY-NS WYE CSOIPRRS100413

Sector: Rail • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

Federal Highway Administration (FHWA) Section 1306 Freight Intermodal Distribution Pilot GRANT Program $5M Granted to Georgia Port Authority (GPA). GPA Applied for $1.5M for use in a NORFOLK SOUTHERN RAILROD WYE NEAR SAVANNAH, CHATHAM COUNTY, GA, to improve freight Rail Service to Garden City Terminal of the Port of Savannah. Total Project Cost is $7,024,000.00, project will be constructed in t

Project Information FAQ

Project Information

4 Q
The project “PILOT GRANT PROGRAM-GA PORTS AUTHORITY-NS WYE CSOIPRRS100413” is an infrastructure initiative in the Rail sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Federal Highway Administration (FHWA) Section 1306 Freight Intermodal Distribution Pilot GRANT Program $5M Granted to Georgia Port Authority (GPA). GPA Applied for $1.5M for use in a NORFOLK SOUTHERN RAILROD WYE NEAR SAVANNAH, CHATHAM COUNTY, GA, to improve freight Rail Service to Garden City Terminal of the Port of Savannah. Total Project Cost is $7,024,000.00, project will be constructed in two PHASES, (1) PHASE 1 for the TRACK Roadbed from original ground to Top of Sub Ballast at an estimated cost of $2,973,351.00 with $1,500,000.00 FHWA Funds as the GDOT Share of the Project and $1,473,351.00 Norfolk Southern Share, (2) PHASE 2 for the TRACK WORK from Top of Sub Ballast to Top of Rail at an estimated cost of $4,050,649.00 Paid 100% by the Railroad (Norfolk Southern corporation). Phase 1 Bid came in at $1,714,813.38 and GDOT Share (80%) is $1,371,850.70 and Norfolk Southern Share (20%) is $342,962.68. As GDOT liable up to $1,500,000 Project set $1,875,000 with NS at $375,000.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data