logo

PILOT GRANT PROGRAM-GA PORTS AUTHORITY-NS WYE CSOIPRRS100413

Sector: Seaport • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

Federal Highway Administration (FHWA) Section 1306 Freight Intermodal Distribution Pilot GRANT Program $5M Granted to Georgia Port Authority (GPA). GPA Applied for $1.5M for use in a NORFOLK SOUTHERN RAILROD WYE NEAR SAVANNAH, CHATHAM COUNTY, GA, to improve freight Rail Service to Garden City Terminal of the Port of Savannah. Total Project Cost is $7,024,000.00, project will be constructed in t

Status
Closed
Sector
Seaport, Rail, Road, Government
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about PILOT GRANT PROGRAM-GA PORTS AUTHORITY-NS WYE CSOIPRRS100413

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PILOT GRANT PROGRAM-GA PORTS AUTHORITY-NS WYE CSOIPRRS100413” is an infrastructure initiative in the Seaport sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Federal Highway Administration (FHWA) Section 1306 Freight Intermodal Distribution Pilot GRANT Program $5M Granted to Georgia Port Authority (GPA). GPA Applied for $1.5M for use in a NORFOLK SOUTHERN RAILROD WYE NEAR SAVANNAH, CHATHAM COUNTY, GA, to improve freight Rail Service to Garden City Terminal of the Port of Savannah. Total Project Cost is $7,024,000.00, project will be constructed in two PHASES, (1) PHASE 1 for the TRACK Roadbed from original ground to Top of Sub Ballast at an estimated cost of $2,973,351.00 with $1,500,000.00 FHWA Funds as the GDOT Share of the Project and $1,473,351.00 Norfolk Southern Share, (2) PHASE 2 for the TRACK WORK from Top of Sub Ballast to Top of Rail at an estimated cost of $4,050,649.00 Paid 100% by the Railroad (Norfolk Southern corporation). Phase 1 Bid came in at $1,714,813.38 and GDOT Share (80%) is $1,371,850.70 and Norfolk Southern Share (20%) is $342,962.68. As GDOT liable up to $1,500,000 Project set $1,875,000 with NS at $375,000.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Seaport, Rail, Road, Government

Article published date

2026-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project