logo

Pilot Grove Road Bridge Replacement Project

Sector: Bridge • Location: Pilot Grove, Missouri, United States

Source: California Democrat

Project
Awarded

Mera Excavating LLC was awarded the project to rebuild the bridge over the tributary on North Monreau Creek on Pilot Grove Road in Moniteau County. The contract duration is 120 calendar days with a completion deadline of December 30, 2026.

Status
Closed
Sector
Bridge, Road
Location
Pilot Grove, Missouri, United States of America
Updated
22 Jul 2026
Source
California Democrat

ConstructChat

Ask ConstructChat about Pilot Grove Road Bridge Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pilot Grove Road Bridge Replacement Project” is an infrastructure initiative in the Bridge sector, located in Pilot Grove, Missouri, United States. Taiyo aggregates data on it from California Democrat.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Mera Excavating LLC was awarded the project to rebuild the bridge over the tributary on North Monreau Creek on Pilot Grove Road in Moniteau County. The contract duration is 120 calendar days with a completion deadline of December 30, 2026.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Pilot Grove

Source

Source

California Democrat

URL

More Details

Record type

Project

Sector

Bridge, Road

Article published date

2026-05-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project