logo
ProjectClosed

Pilot Knob Supply Water Transmission Main

Sector: Water Supply and Storage • Location: Austin, Texas, United States of America

Source: Dodge

The Pilot Knob Supply Water Transmission Main is a project to install a 72-inch water transmission main from existing 66-inch water transmission main north of the Colorado River near Longhorn Dam to the Pilot Knob Reservoir. The route would ideally travel along US 183, SH 71, SH 130, and FM 812 to provide additional redundancy to the southeast service area. The total length is approximately 76,000

Status
Closed
Sector
Water Supply and Storage, Hydro, Government, Road, Waste Processing and Treatment, Commercial, Manufacturing (Industrial)
Location
Austin, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Pilot Knob Supply Water Transmission Main

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pilot Knob Supply Water Transmission Main” is an infrastructure initiative in the Water Supply and Storage sector, located in Austin, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Pilot Knob Supply Water Transmission Main is a project to install a 72-inch water transmission main from existing 66-inch water transmission main north of the Colorado River near Longhorn Dam to the Pilot Knob Reservoir. The route would ideally travel along US 183, SH 71, SH 130, and FM 812 to provide additional redundancy to the southeast service area. The total length is approximately 76,000 linear feet of 72-inch water transmission main, depending on the route that will be selected und...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Austin

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Government, Road, Waste Processing and Treatment, Commercial, Manufacturing (Industrial)

Article published date

2025-09-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project