Pilot Uzbek Renewable Hydrogen Project - WPP
The status, timeline and source of this project. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
The Project entails the provision of a senior secured loan on a project finance basis to finance the construction of an integrated green hydrogen production facility consisting of a 20 MW electrolyser fed by greenfield 52 MW wind power plant to produce c. 3,000 tons of renewable hydrogen annually. The hydrogen electrolyser will be located in Chirchiq city, Tashkent region, and the wind power plant
- Status
- Under Construction
- Sector
- Chemical (Industrial), Hydrogen, Power Generation (CCGT), Wind, Manufacturing (Industrial), Water Supply and Storage, Commercial, Road, Residential
- Location
- Uzbekistan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Pilot Uzbek Renewable Hydrogen Project - WPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | repaying |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project entails the provision of a senior secured loan on a project finance basis to finance the construction of an integrated green hydrogen production facility consisting of a 20 MW electrolyser fed by greenfield 52 MW wind power plant to produce c. 3,000 tons of renewable hydrogen annually. The hydrogen electrolyser will be located in Chirchiq city, Tashkent region, and the wind power plant will be in Bash town, Bukhara region. The wind facility will be an expansion of existing EBRD-financed Uzbekistan: Bash WPP. The sponsors of the Project will be ACWA Power Company, an international developer of power generation and desalinated water projects, and Joint Stock Company UzKimyoSanoat, a chemical manufacturer based in the Republic of Uzbekistan. The Project will be controlled and majority-owned by ACWA Power. ESIA disclosure package Attach the following documents in Russian and English. Download package in English Download package in Russian Download package in Uzbek https://www.acwapower.com/en/sustainability/hsse-management/ Local physical addresses, contact name and telephone: Business Center “Simurg” Block A, 3rd Floor, Amir Temur Avenue 88a, Tashkent, 100084, Uzbekistan Mr. Alimardon Abdukarimov aabdukarimov@acwapower.com + 998 90 017 99 60 Gijduvan municipality Gijduvon tumani, Mustaqillik maydoni 2-uy. Bukhara region, Uzbekistan Tel.: (365) 572-12-35 and EBRD Tashkent Resident Office, 13th floor, Banking Association of Uzbekistan, 1,Qoratosh Street, Tashkent, 100027, Uzbekistan Gulyayeva Irina +998 78-140-44-00 Environmental and social enquiries Business Center “Simurg” Block A, 3rd Floor, Amir Temur Avenue 88a, Tashkent, 100084, Uzbekistan Mr. Alimardon Abdukarimov aabdukarimov@acwapower.com + 998 90 017 99 60 General enquiries Business Center “Simurg” Block A, 3rd Floor, Amir Temur Avenue 88a, Tashkent, 100084, Uzbekistan Mr. Alimardon Abdukarimov aabdukarimov@acwapower.com + 998 90 017 99 60 |
Original sector | Energy |
Budget |
Location
Country | Uzbekistan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Hydrogen, Power Generation (CCGT), Wind, Manufacturing (Industrial), Water Supply and Storage, Commercial, Road, Residential |
Article published date | 2026-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
