Pilot Uzbek Renewable Hydrogen Project
Sector: Wind • Location: Uzbekistan
Source: World Bank Group
This project entails the construction of an integrated renewable hydrogen production facility, which includes a 20 MW electrolyser powered by a 52 MW extension of Bash wind power plant. The goal is to produce approximately 3,000 tonnes of renewable hydrogen annually. The electrolyser will be located in Chirchiq City, Tashkent region, and the wind power plant is in the Gijduvon district, Bukhara re
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project entails the construction of an integrated renewable hydrogen production facility, which includes a 20 MW electrolyser powered by a 52 MW extension of Bash wind power plant. The goal is to produce approximately 3,000 tonnes of renewable hydrogen annually. The electrolyser will be located in Chirchiq City, Tashkent region, and the wind power plant is in the Gijduvon district, Bukhara region, Uzbekistan. The European Bank for Reconstruction and Development (EBRD) has provided financing of $21.2 million for the project, and another $25 million loan comes from the German Development Agency (DEG, part of KfW Group). The project company responsible for implementing the project is ACWA Power UKS Green H2 LLC, sponsored by ACWA Power Company and Joint Stock Company UzKimyoSanoat. The financial agreement was concluded on June 25, 2024. https://www.ebrd.com/work-with-us/projects/psd/54561.html https://www.ebrd.com/work-with-us/projects/psd/54561.html |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Wind projects in Uzbekistan
- Zarafshon Wind Farm
- Sirdarya CCGT Power Plant Shirin
- Sirdarya combined-cycle gas turbine plant
- Uzbekistan: ACWA Power Renewable Energy Loan (Previously: ACWA Power Sustainable Energy Development Capital Facility)
- Uzbekistan: ACWA Power Renewable Energy Loan (Previously: ACWA Power Sustainable Energy Development Capital Facility)
- Uzbekistan: ACWA Power Renewable Energy Loan (Previously: ACWA Power Sustainable Energy Development Capital Facility)
- Uzbekistan: ACWA Power Renewable Energy Loan (Previously: ACWA Power Sustainable Energy Development Capital Facility)
- Uzbekistan: ACWA Power Renewable Energy Loan (Previously: ACWA Power Sustainable Energy Development Capital Facility)
