logo
ProjectClosed

Pilot Water Supply Project

Sector: Water Supply and Storage • Location: Uzbekistan

Source: World Bank Group

The main objectives of the Pilot Water Supply Engineering Project are to: 1) improve the design and implementation arrangements for the full scale project through a "learning-by-doing" piloting approach and by incorporating community participation into the planning and implementation process for water supply and distribution; 2) speed up implementation of the full scale project through early compl

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government
Location
Uzbekistan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Pilot Water Supply Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pilot Water Supply Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Uzbekistan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main objectives of the Pilot Water Supply Engineering Project are to: 1) improve the design and implementation arrangements for the full scale project through a "learning-by-doing" piloting approach and by incorporating community participation into the planning and implementation process for water supply and distribution; 2) speed up implementation of the full scale project through early completion of detailed engineering design and preparation of bidding documents; and 3) develop and test joint financing and cost recovery schemes to improve the financial viability of the Vodokanals and the sustainability of their investments. The project consists of two components: 1) an investment component to finance a pilot project for a community based water supply and distribution scheme in Kizketken peri-urban area of Nukus in the Republic of Karakalpakstan; and 2) a technical assistance component for management and supervision of pilot project implementation, and for preparation of tender designs and bidding documents for procurement packages for the full scale project, followed by preparation of detailed engineering designs, project management plans and implementation schedules.

Original sector

FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Uzbekistan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project